Works Management - For News and Suppliers of Plant & Manufacturers Services
 
   
Search :   Search Help    login

What can go wrong when you give IT the large 18/12/2006
 
The news that the Airbus A380 is two years behind schedule because its German and Spanish offices were using Catia V4 CAD/CAM software, while its French and UK offices used V5, and the German engineers in Hamburg could not add their electrical wiring design changes to the common 3D digital mock-up in France, should serve as a warning to us all.
 
Author
Dr Tom Shelley
 
 
Download Articles
 
 MCSNovPage30-31.pdf
 
This material is protected by Findlay Publications copyright 2008.
See Terms and Conditions.
One-off usage is permitted but bulk copying is not.
For multiple copies contact the sales team.
Email this article
 
News Item
Download Articles
 
 MCSNovPage30-31.pdf
 
 
News Item
Linked Companies
 
 UGS
 
 IBM (UK) Ltd
 
 Parametric Technology GmbH
 
 Autodesk Ltd
 
 Dassault Systemes
 
 Parametric Technology (UK) Ltd
 
 
News Item
Similar News Articles
 
  Airbus pulls back from French factory sales
 
  Boilers v 4x4s
 
  Rolls makes strong progress
 
  Bentley designers turn to Bond book
 
  Bentley racing green
 
 
News Item
Similar Features Directory Articles
 
  Controlling change
 
  No pain, no gain
 
  Going global with collaborative design
 
  Managing your change much better
 
  Data hub gets global bearings group rolling
 
 
News Item
Related Industry Events
 
  Test & Measurement Design Day